Sectional doors EFE Hotel Marinela

Sectional, partition doors EFE Hotel Marinela

  • Location: Sofia
  • Area: 110 000 sq.m.
  • Artist: Romanov Group Ltd.
  • Client: VG AD, Hotel "Marinella"
  • Term of execution: 15.05.2015 - 09.09.2015

Construction of a metal bearing structure in the largest multifunctional hall for large corporate events, exhibitions, conferences, music events, concerts and private parties in Sofia - EFE Hall, Hotel Marinella;
Supply and installation of 2 700 cm length and 750 cm height soundproofing partition doors as well as noise-proof doors resistant to atmospheric influences with dimensions 1,400 cm length and 650 cm height;
Delivery and installation of interior doors by individual project;
Repair of interior and exterior of EFE Hall.

Thanks to the professionalism of the head of Romanov Group Ltd. Roman Romanov, no deviation from the interim deadlines or from the norms for making and accepting construction works was registered.

The management of Romanov Group Ltd has the exclusive responsibility to comply with the legal and legal base of the Republic of Bulgaria in protecting the life and health of the workers on the construction site as well as protecting the environment surrounding the construction site.

Building materials and state-of-the-art technologies have been used during the construction process.

The assigned construction and assembly works related to the execution, delivery and installation of the highest partition doors in Europe were carried out between 15.05.2015 and 09.09.2015. They included strengthening the roof structure of the EFE Hall, metal bearing structure for the long 27 meters and weighing 13,500 kg doors. In the short terms of realization of the site and with the European requirements for quality of the construction works, the engineering and technical staff and the company staff showed good organization, high technological discipline and strict observation of the agreed terms. Building materials and state-of-the-art technologies have been used during the construction process. No deviations from the design documentation were allowed, as all our quality performance requirements were met. Thanks to the professionalism of the head of Romanov Group Ltd. Roman Romanov, no deviation from the interim deadlines or from the norms for making and accepting construction works was registered.
The management of Romanov Group Ltd has the exclusive responsibility to comply with the legal and legal base of the Republic of Bulgaria in protecting the life and health of the workers on the construction site as well as protecting the environment surrounding the construction site.
I find that Romanov Group Ltd has competent technical staff, qualified contractors and a perfect organization for all types of construction and assembly activities.

For us Quality is the first - to build and the customer to remain satisfied is our main goal. Turnkey construction and repair of an apartment or MOL construction is not important to us because we know that quality control and customer satisfaction are the true builder of our future.

Over the years, experience has come. Since we have been engaged in construction, for fifteen years our company has been renovating and building not just buildings, we build trust, contacts and a sense of responsibility.

PROJECT RELATED

MySalon Suite

MySalon Suite

Aperiri admodum voluptaria ut pri adhuc velit augue in per. Qui te vero tritani, at nibh epicuri voluptaria quo.

Read more
EverGreen Office Park

EverGreen Office Park

State-of-the-art features are throughout the building, which was leased to Advance Medical Imaging.

Read more
World Wide Business Center

World Wide Business Center

Delenit interesset an mei, ut eos tota vivendo deseruisse. East at facete delenit democritum. You nihil aliquip ornatus how.

Read more
The Pump House

The Pump House

The Pump House Frozen Yogurt Shop is located in the center of Grand Haven, Michigan.

Read more